21 days of painting 3 months of drying time 2 studios 2 supporting paintings 1 supporting drawing 2 pages of supporting sketches 1 hand copy of the groundwork £50 of materials 20 packets of Smarties 1 brother-in-law 15 yards of
21 days of painting 3 months of drying time 2 studios 2 supporting paintings 1 supporting drawing 2 pages of supporting sketches 1 hand copy of the groundwork £50 of materials 20 packets of Smarties 1 brother-in-law 15 yards of
Finished? On what was the last day of serious painting, I set up to paint the tiles, and ended up by finishing all but the final tweaks, of which there may be none. The first thing to do was set
Finished? On what was the last day of serious painting, I set up to paint the tiles, and ended up by finishing all but the final tweaks, of which there may be none. The first thing to do was set
Face, hands, skin, more towel… This is nearly finished. I have found as I get further along that I can complete larger and larger areas of surface, because I am guided by what is underneath, and no longer have to
Face, hands, skin, more towel… This is nearly finished. I have found as I get further along that I can complete larger and larger areas of surface, because I am guided by what is underneath, and no longer have to
Moving the eyeball Today I dealt with a problem highlighted by my electronic check. I had filled in the wrong outline on the eyeball, thinking a patch of shade was the edge of the eye, not the underpart of the
Moving the eyeball Today I dealt with a problem highlighted by my electronic check. I had filled in the wrong outline on the eyeball, thinking a patch of shade was the edge of the eye, not the underpart of the
Today, the towel had to be brought up to a decent level of completion. I went back through my notes and found that I had used viridian, a cool blue, and white on the far part, with a few warmer
Today, the towel had to be brought up to a decent level of completion. I went back through my notes and found that I had used viridian, a cool blue, and white on the far part, with a few warmer
Today’s work was the face once more. I had intended to get to the top layer of paint, but a few factors got in the way.
Today’s work was the face once more. I had intended to get to the top layer of paint, but a few factors got in the way.
At some point I was going to have to tackle the tiling. Today was the day. Tiles, in general, go on in straight lines, and the human eye-brain combo is good at checking that lines are straight. It is also
At some point I was going to have to tackle the tiling. Today was the day. Tiles, in general, go on in straight lines, and the human eye-brain combo is good at checking that lines are straight. It is also